About the project

Maidstone Borough Council and Maidstone Property Holdings, has been working with ZED PODS to design an innovative, low-carbon, highly energy-efficient housing development aimed at creating a mixed tenure scheme comprising of market rent and affordable social rent in Maidstone town centre. The scheme seeks to utilise the ‘airspace’ over the existing King Street Car Park, whilst retaining the parking spaces beneath — thus delivering an excellent solution to making efficient use of land, retaining parking capacity for visitors to the town centre, contributing to the challenge of delivering sustainable development and contributing to meeting local housing need.

It is a pioneering environmental and socially focused development which will deliver much-needed living space for young professionals, keyworkers and vulnerable households in need of affordable housing.

Site Location

Project Team

Maidstone-Property-Logo.png

Maidstone Property Holdings Ltd

Real Estate

Z-Pods_Logo-01.png

ZED PODS Ltd

Architects

Key Principles:

  • Activating under-utilised land within a highly accessible town centre location.

  • Delivering sustainable and energy-efficient homes aimed at meeting the needs of local Maidstone residents.

  • 16 new homes consisting of a mix of 1 and 2-bed apartments (of which 10 will be market rent and 6 will be offered as affordable social rent units).

  • All apartments will meet the Nationally Described Space Standard with most, having access to private amenity space.

  • All apartments are super-insulated, airtight homes with minimal energy demand to ensure the lowest possible running costs.

  • Solar power generation to provide low-energy water/heating — annual production will generate more energy than the development consumes.

  • Robust party wall construction performance to achieve fire ratings to comply with Building Regulations and a Fire Safety Plan.

  • The proposal will activate the site, improve the street scene and improvements to the boundary with planting.

  • The solar panels combined with the DER improvements should result in 100% offset of regulated carbon emission — creating a net-zero development.

  • The proposed design will enable parking underneath the apartments, with ample lighting.

  • Enabling upgrading of existing car parking services at no cost to the Council

About the project

Massing Options

We explored several different positions on site to situate the proposed massing. We have sought to develop a balance of providing more units whilst minimising the disruption on surrounding views, over-shading and overlooking concerns.

Site Massing

The scheme comprises of 16 self-contained residential units of the following configuration:

6 x 1B 2P (1-storey)

10 x 2B 4P (1-storey)

 

Communal facilities include secure external bin store and cycle store, public and private green space 

58 no. parking spaces including 4 disabled parking spaces, 2 EV charging bays and 2 motorcycle bays

 

The scheme also shows allowance for site-specific constraints and opportunities whilst respecting existing amenities.

Project Timeline — Preparing Planning Applicaiton

Project Brief approved by the Council 

Undertook Feasibility Studies

Agree on Project Budget

Prepare Project Programme

Stage-1.png
​Complete​d
Completed
Feasibility-study.png

Architectural Concept approved by the Council and aligned to the Project Brief

Obtain pre-application Planning Advice

Initial Cost Plan

Stage-2.png
Completed
concept-design.png

Planning application to be submitted

2021 - To be confirmed

Stage-2-not-done.png
Upcoming
Spatial-Coordination.png

 Building Regulations Application

 Construction Phase Plan

Stage-2-not-done.png
Upcoming
Technical-Design.png

Building handed over to the Council

Stage-2-not-done.png
Upcoming
Handover.png

Residents move in

Stage-2-not-done.png
Upcoming
Use.png

Develop Business Case

Review Project Risks

Review Project Budget

Undertook Site Appraisals

Stage-0.png
Completed
Strategic-Definition.png

Construction off-site to minimise disruption and site installation

Stage-2-not-done.png
Upcoming
Manufacturing-and-Construction.png

Upcoming — Preparing to Submit our Planning Application

Winter 2020/21 • In Progress

We will provide a further update to our website in the next couple of weeks when we have a more precise date for submitting the application, and we will inform the local community before any application is submitted.

Timeline
Online Exhibition

Open Consultation Events

  1. Wednesday, 26 May 2021 from 18:30 to 20:30 — Completed

  2. Thursday, 3 June 2021 from 18:30 to 20:30 — Completed

  3. Thursday, 12 August 2021 from 18:30 to 20:30 — Completed

IMG_0297.jpg
IMG_0291.jpg

Tell us what matters to you about housing delivery in Maidstone.

We are seeking public comments to understand how the community feels about the proposed development and to identify ways in which we can better meet community needs.

Polls

Community Notice Board

Coming soon...

Screenshot 2021-02-08 at 15.39.06.png
Community Notice Board

Feedback

We are preparing to submit our application to Maidstone Borough Council.

In the meantime, our project team is on hand to answer any questions you may have. Please feel free to get in touch at any time.

We value your feedback, but respect the privacy of your inbox. We’re asking for your email so that we can let you know when your feedback has influenced a decision or to keep you updated on the consultation. Terms & Conditions and Privacy Policy

Thank you for your feedback.

Feedback
ZEDpods logos white.png

ZED PODS is the British leading accredited specialist in modular built homes over car parks & land that cannot otherwise be developed.

CIAT Chartered Practice white.png

Copyright © 2021 ZED PODS Limited. All rights reserved. 

Registered in England and Wales.  Company Number: 10063743

CONTACT

+44(0)20 3983 3114

projects@zedpods.com

ZED PODS Ltd, 3rd Floor,

6 - 8 Bonhill Street

London EC2A 4BX

bottom of page